Pictures coming soon
We are currently in the process of repainting the second bedroom since we figured purple is not for everybody. We will get pictures of both bedrooms soon. Thanks for looking!
Half Bath
This is the 1/2 Bathroom. It is located downstairs next to the living room. We repainted this room a candlelight yellow, replaced some of the fixtures, and added the Cabinet above the toilet. It is nice to have this second bathroom so we don't have to send our guests upstairs to use the bathroom.
Full Bath
When we first moved in, this bathroom was a shocking smurf blue, the floor had large holes in the laminate, and there was no vanity. We repainted (twice), replaced the vanity and mirror, and put in a marble floor. The bathtub has had some tiles replaced as well, giving it a clean, fresh look.
Kitchen
The stove is new as of 2011 and there is a microwave above the stove, which frees up more counter space. There is a dishwasher and new paint as of 2009.
Living Room
This is the room we spend most of our time in. The paint is new as of 2009 and we re-tiled the entry way in 2010. This space has beautiful crown molding, which brings sophistication to the room. The ceiling fan is also a beautiful touch, which helps cut cooling costs in the blistering Omaha heat.
Subscribe to:
Comments (Atom)









